Design and delivery of a complete hydraulic vulcanization press.
Working length: 4,000 mm
Nominal pressure: 400 tons
Design and delivery of a complete hydraulic vulcanization press.
Working length: 4,000 mm
Nominal pressure: 400 tons
Photos of exemplary realizations of assembly and assembly-control stations.
Design and implementation of the XYZ Cartesian manipulator with travels of 2.2.2 [m] for a professional Anechoic Chamber.
Comprehensive design and implementation of an electrical measurement station in accordance with individual customer requirements. The stand is equipped with professional devices, incl. YOKOGAWA, GW INSTEK.
An innovative design and construction of a pneumatic manipulator for moving and mounting the glass.
The device that holds the glass under pressure has 6 degrees of freedom.
In addition, the operator applies glue to the surface of the glass by freely rotating the glass.
Pneumatic logic prevents the window from dropping in the event of pressure failure or operator error.
Design and delivery of two robotic lines for assembling components in automotive dashboards:
A complete station for welding plastic car parts and assembling clips:
Two sets supporting the assembly of heavy elements. Manual manipulator with pneumatic logic that changes the power of support depending on the transferred load. The stand, with a pneumatically driven rotary table and a docking station for the manipulator, allows you to easily and safely move a workpiece weighing 35 kg.
The manipulator reduces the weight of the lifted detail to 5 kg. An additional pneumatic drawer for Euro pallets facilitates access to the parts.
Modernization of the device in the scope of:
Design and workshop execution of two (11 and 19 meters long) chain conveyors for a foreign customer.
Workshop execution of a steel frame according to the documentation provided by the customer.
Welding of a stainless steel container for a grate cleaner of hydropower plants.
The container is 13 meters long and weighs 2,200 kg, with track guides mounted on its long sides.
Concept, design and production of a device for valve assembly. The valves require the assembly of components on three sides.
For this purpose, a lifting mechanism is used to rotate the mounting plate. Moving the lever 15 degrees rotates the plate 90 degrees.